Construction works are well underway at Tec-NQ as part of our second significant project with school: a much needed expansion of their learning areas at their Douglas campus.
The project has involved temporary decommissioning of existing ground floor classrooms so that the existing roof could be removed, and a new second level built to accommodate new learning areas and links to the mezzanine level of the adjoining automotive trades training workshop.
Tec-NQ is a secondary school and a Registered Training Organisation all in one, offering full-time apprentice training, school-based apprentice programs and other trade training to school-aged students.




CLIENT: Tec-NQ
ARCHITECT: Novum
Peter Boyce, Peter Edwards, Dave Mutuc, Jeffrey Smith
CONTRACTOR: Taylor Builders
TOWN PLANNER: RPS
CERTIFIER: GMA Certification Group
CIVIL ENGINEER: Bligh Tanner
STRUCTURAL ENGINEER: Bligh Tanner
HYDRAULIC ENGINEER: Compass Consulting Group
ELECTRICAL ENGINEER: Ashburner Francis
MECHANICAL ENGINEER: Ashburner Francis
ENERGY EFFICIENCY: Ashburner Francis
GEOTECHNICAL ENGINEER: Douglas Partners
FIRE ENGINEER: Firecheck Consultants
SITE SURVEYOR: Vision Surveys